Cut-off grade
Work out the break-even grade at which a tonne of rock covers its own mining, processing and overhead costs.
- Total cost per tonne
- $18.00
How it works
This is a full-cost break-even cut-off: cost per tonne divided by the value of the metal recovered from one unit of grade, which is metal price times recovery times the share left after any royalty. A mill or marginal cut-off leaves out the mining cost, because the rock has already been mined.
Costs and metal price must be in the same currency. Gold and silver use price per troy ounce and give a cut-off in g/t. Base metals use price per pound and give a cut-off in percent.
It leaves out refining charges and payability. Economic studies set their own cut-offs with more detail than this, such as different costs for open pit and underground. Read the study's assumptions before comparing.
For education only. Not investment advice. The results are only as good as the numbers entered; check every figure against the company's own filings. See the Disclaimer.
Get the plain-language letter
New Beginner Series guides, Market Notes and tools by email. Sponsored items are always labelled.